eBlock 372
144 MW
288 MWh
Installed Capacity
Qintang District, Guigang City, Guangxi Zhuang Autonomous Region
Grid Connection Time:May 2023
Grid Connection Time:May 2023
Power-Side Energy Storage Power Station
With our exceptional product capabilities, JD Energy stood out among 35 competitive bidders. The project employs our modular liquid-cooled energy storage cabinet product, eBlock-372. Together with the Chongzuo project also located in Guigang, it represents a total construction scale of 518MWh, the largest distributed energy storage solution in southern China. Leveraging an energy management system built on an energy IoT architecture with cluster-coordinated management capabilities, JD Energy effectively addresses dispatch coordination challenges in large-scale applications of modular distributed energy storage products. This significantly enhances the safety and economic efficiency of energy storage power stations.