HomeProducts and CasesGrid-side Energy StorageCase details
eBlock 372
100 MW
200 MWh
Installed Capacity
Litong District, Wuzhong City, Ningxia Hui Autonomous Region
Grid Connection Time:Dec. 2022
Shared Energy Storage Power Station, Tongli Substation of Ningxia Dachu Technology Co., Ltd.

The project uses our modular liquid-cooled energy storage cabinet product, eBlock-372, with a capacity of 100MW/200MWh. It was grid-connected and commissioned within an unprecedented period of 45 days, from November to December 2022, setting a new industry benchmark for large-scale energy storage projects. After grid connection and commissioning, the power station provides peak shaving, frequency regulation, and shared services to multiple new energy stations in the region. According to data, the station achieved the highest average charge-discharge utilization hours in Ningxia for two consecutive months.

Send email
Customer